S.No. | Name & Description of Project | Client |
01 | Improvement/Widening to 2-lane with paved shoulder/4-lanning of NH-40 between Shillong to Dawki road upto Bangladesh Border including Dawki Bridge from (Design km 63+530 to km 71+520) design length of 7.99 km in the State of Meghalaya for execution on EPC mode under JICA funding - (Package-V)-Balance Work Note-"GST Amount will be reimbursed after providing copy of B2B screen shot, GSTR-3B and GSTR-1 for the respective month. Conducting of Geo Investigation for our Project at Dawki (Meghalaya) Pkg-5 | ASC Infratech Pvt Ltd |
02 | GEOTECHNICAL INVESTIGATION FOR CONSUTANCY SERVICES FOR FEASIBILITY STUDY ,PREPARATION OF DETAILED PROJECT REPORT(DPR) AND PROVIDING PRECONSTRUCTION SERVICES IN RESPECT OF TUTING-MUIRBE- ANE ROAD (INDICATIVE LENGTH 72.0 KM) GREEN FIELD ALIGNMENT FOR CONSTRUCTION AND UPGRADATION TO NHSL SPECIFICATION UNDER 1448 BCC/761 BRTF IN AOR OF (P) BRAHMANK | M/s GREEN DESIGN AND ENGINEERING SERCICES PVT. LTD |
03 | GEOTECHNICAL INVESTIGATION FOR - IMPROVEMENT & UP-GRADATION OF NH- 4 (NEW-30) STRECH PILIBHIT TO SITARGANJ FROM KM. 32+500 TO 64+800 & CH. 0.00 TO 6.00 (SITARGANJ BYPASS ) HAM BASIS IN THE STATE OF UTTAR PRADESH AND UTTARAKHAND (PACKAGE-II BAREILLY-SITARGANJ) | TECKKONECT |