S.No. | Name & Description of Project | Client |
01. | Construction of 4 Lane with paves shoulders from Design Ch. 182.300 to Design Ch. 228.500 in Belgaum - Hungud - Raichur Section of NH748 (Ext. SH-20) in the state of Karnataka on Hybrid Annuity Mode Package-5) [Project Length - 46.200 Kms] | G R Infraprojects |
02. | Consultancy Services for Geotechnical Investigation work of Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway | HG Infra Engineering Limited |
03. | Geotechnical Investigation for ““Construction of 4 Lane Greenfield North-Eastside Gorakhpur Bypass (26.616 Kms) starting from NH-28 (Km 285.100) in the State of Uttar Pradesh under Bharatmala Pariyojana” | Khanna Designers & Consultants Pvt Ltd |
04. | Geotechnical Investigation for four laning of NH-119 from Bshuma at km. 39.250 (Ex. Km 39+240) Bijnor at km. 78.810 (Ex. Km. 86+590) Design Length (39+560 km.) in the state of Uttar Pradesh on hybrid Annuity | CivilMantra Infracon Pvt Ltd. |
05. | Geotechnical investigation for Development of 6 lane Kanpur Ring Road green field on EPC basis in the state of Uttar Pradesh Package-IV: Jarkalan – Sachendi Road, (Length-24.553 Kms), Start from 68+650 to Ch. 93+209. | Khanna Designers & Consultants Pvt Ltd |
06. | Geotechnical Investigation for Proposed Construction of 2 lanes ROB over L.C NO. S-53/T-2 at CH. 50+665 of NH-703A (Jalandhar – Kapurthala – Sultanpur Lodhi – Makhu) in the State of Punjab on EPC Mode] | VASL Infra Consultant LLP |
07. | GEOTECHNICAL INVESTIGATION FOR PROPOSED CONSTRUCTION OF ROB AT KM. 202+992 ON NH-76 WITH APPROACHES IN THA STATE OF UTTAR PRADESH ON ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) MODE | Khanna Designers & Consultants Pvt. Ltd. |
08. | Geotechnical Investigation for Four Laning with paved shoulders of Rajasthan Border to Fatehpur & Missing link upto Salasar Section of NH65 under NHDP Phase-IV, on DBFOT (Toll) Basis In the State of Rajasthan | CIVILBABA INFRA CONSULTANT PVT. LTD. |
09. | Geotechnical Inestigation for Construction of Six Laning of EtawahChakeri (Kanpur) section of NH-2 from Km. 323.475 to kM. 483.687 in the state of Uttar Pradesh under NHDP Phase-V on Design, Build, Finanace, Operate and Transfer (DBFOT) Toll Basis | ANV Design Associates |
10. | CONSTRUCTION OF 2 LANES ROB OVER L.C. NO. S-53/T-2 AT CH. 50+665 OF NH-703A (JALANDHAR - KAPURTHALA – SULTANPUR LODHI – MAHU) IN THE STATE OF PUNJAB ON EPC MODE | VASL Infra Consultant LLP |
11. | CONSTRUCTION OF FOUR LANE HIGHWAY FROM GAZIPUR - BALLIA - UP/BIHAR STATE BORDER (GREENFIELD) SECTION OF NH-31: PACKAGE I [FROM HRIDAIPUR (KM 0.000) TO SHAHAPUR (KM 42.500)] ON EPC MODE IN THE STATE OF UTTAR PRADESH | Teckkonnect |
12. | GEOTECHNICAL INVESTIGATION FOR PROPOSED CONSTRUCTION OF | TATA REALTY AND INFRASTRUCTURE LIMITED |
13. | GEOTECHNICAL INVESTIGATION FOR EIGHT LANE ACCESS CONTROLLED EXPRESSWAY FROM KM. 26.582 TO KM. 50.700 (SHIRSAD - MASVAN SECTION OF VADODARA MUMBAI EXPRESSWAY) IN THE STATE OF MAHARASHTRA ON HYBRID ANNUITY MODE UNDER BHARATMALA PARIYOJANA (VME PHASE IIPACKAGE XIII) | G R INFRAPROJECTS |
14. | SUB-SOIL INVESTIGATION FOR REHABILITATION AND UP GRADATION FROM KM. 51.600 TO KM 75.700 OF NH-321G (NUHKHAS TO ETAH SECTION) PKE-I TO TWO LANE WITH PAVED SHOULDER CONFIGURATION UNDER EPC MODE IN THE STATE OF UTTAR PRADESH. | CivilMantra Infracon Pvt. Ltd. |
15. | GEOTECHNICAL INVESTIGATION FOR 5MW SOLAR PROJECT AT AJGAIN IN DISTRICT UNNAO IN THE STATE OF UTTAR PRADESH | LINDE INDIA LIMITED |
16. | SUB-SOIL INVESTIGATION FOR “SIX LANING OF AURANGABAD TO BIHAR – JHARKHAND BORDER (CHORDAHA), SECTION OF NH-2 FROM 209+827 TO KM. 249+525 (PKG-II) IN THE STATE OF BIHAR UNDER BHARATMALA ON EPC MODE. | VRC CONSTRUCTION INDIA PRIVATE LIMITED |
17. | GEOTECHNICAL INVESTIGATION FOR DEVELOPMENT OF 4/6 LANE MOHALI TO SIRHIND GREENFIELD HIGHWAY SECTION (DESIGN LENGTH: 27.37 KM.) UNDER BHARATMALA PARIYOJANA IN THE STATE OF PUNJAB | CIVILBABA INFRA CONSULTANT PVT. LTD. |
18. | GEOTECHNICAL INVESTIGATION FOR DOUBLING OF RAILWAY TRACK BETWEEN LUDHIANA AND KILA RAIPUR (17.174 KM) INCLUDING 25 KV HIGH RISE OHE RAILWAY ELECTRIFICATION AND SIGNALLING & TELECOMMUNICATION WORKS ON (EPC) MODE AT LUDHIYANA IN THE STATE OF PUNJAB FOR FORMATION/RCC BOX/OVER HEAD TANK/STAFF QUARTERS/MAJOR BRIDGE/MINOR BRIDGE | L&W Infrastructure Pvt. Ltd. |
19. | SUB-SOIL INVESTIGATION FOR CONSTRUCTION OF BALANCE WORK OF PROPOSED 2-LANE ROB AND ITS APPROACHES IN LIEU OF EXISTING LEVEL CROSSING NO. A-142 AT KM 1.00 ON NH709EXTN. NEAR SADULPUR RAILWAY STATION IN DISTRICT CHURU IN THE STATE OF RAJASTHAN. | CIVILBABA INFRA CONSULTANT PVT. LTD. |
20. | GEOTECHNICAL INVESTIGATION FOR CONSTRUCTION BALANCE WORK OF PROPSED 2-LANE ROB AND ITS APPROACHES NEAR SAWAI MADHOPUR RAIWAYS STATION IN THE STATE OF RAJASTHAN. | CIVILBABA INFRA CONSULTANT PVT. LTD. |
21. | GEOTECHNICAL INVESTIGATION FOR KOTA-MJT SECTION PROVISION OF TWO LANE ROAD OVER BRIDGE (ROB) IN LIEU OF LC NO: 192 (TVU=97513) AT KM :1119/18-20 BETWEEN PDZ-SMBJ STATIONS IN THE SECTION OF ADEN-GGC IN THE STATE OF RAJASTHAN | VASL Infra Consultant LLP |
22. | GEOTECHNICAL INVESTIGATION FOR KOTA-MJT SECTION PROVISION OF TWO LANE ROAD OVER BRIDGE (ROB) IN LIEU OF LC NO: 232 (TVU=80535) AT KM :1193/02-04 BETWEEN PINGORA-SEWAR STATIONS IN THE SECTION OF ADEN-BTE IN THE STATE OF RAJASTHAN | VASL Infra Consultant LLP |
23. | GEOTECHNICAL INVESTIGATION FOR PROPOSED CONSTRUCTION OF COMMERCIAL BUILDING (LGF+UGF+3) AT OPPOSITE MEDANTA HOSPITAL IN LUCKNOW, UTTAR. PRADESH | Mr. J. P. YADAV |
24. | SUB-SOIL INVESTIGATION FOR “OHE FOUNDATION CASTING IN MUKUNDPUR DEPOT NEW DELHI | KEC INTERNATIONAL LIMITED |
25. | GEOTECHNICAL INVESTIGATION WORK AT U.P. WATER PROJECTS | NCC LIMITED |
26. | GEOTECHNICAL INVESTIGATION WORK AT U.P. WATER PROJECTS IN THE DISTRICT OF KAUSHAMBI COVERING VILLAGE WITH HOUSEHOLD CONNECTIONS UNDER JAL JEEVAN MISSION | JMC PROJECTS (INDIA) LIMITED |
27. | GEOTECHNICAL INVESTIGATION FOR REHABILITATION AND UP GRADATION OF EXISTING ROAD TO TWO LANE WITH PAVED SHOULDER CONFIGURATION FROM DESIGN CHAINAGE KM. 36/400 TO KM. 107/224 OF NH-167BG FROM DUTTALUR (AT NH565 JUNCTION) TO KAVALI (JOINING ON NH-16) IN THE STATE OF ANDRA PRADESH ON EPC BASIS. | TSR NIRMAAN PRIVATE LIMITED |
28. | SUB-SOIL INVESTIGATION FOR CONSULTANCY SERVICES FOR PREPAIRATION OF DETAILED PROJECT REPORT FOR REHABILITATION AND UPGRADING TO 2-LANE WITH PAVED SHOULDER CONFIGURATION AND STRENGTHENING FOR HEWNA ASHYARI SECTION FROM CH. 25+000 TO CH. 50+000 OF NH-707 IN THE STATE OF HIMANCHAL PRADESH. | MS PARK FUTURISTICS & ASSOCIATES |
29. | GEOTECHNICAL INVESTIGATION FOR REHABILITATION & UP – GRADATION OF MUDKHED TO NANDED SECTION FROM KM. 372+000 TO KM 388+400 OF NH 161A I.E. NANDED-BHOKAR – HIMAYAT NAGAR-KINWAT-MAHUR-ARNI ROAD (DESIGN CHAINAGE FROM KM 372+000 (MUDKHED) TO KM 387+650 (NANDED) OF NH 161A) (LENGH 15.65 KM) TO 2/4 LANE WITH PAVED SHOULDERS CONFIGURATION IN THE STATE OF MAHARASTRASHTRA ON EPC MODE. | SABZ INFRA SOLUTIONS |
30. | SUB-SOIL INVESTIGATION FOR “CONSTRUCTION/EXTENTION OF DUDHADHARI ELEVATED FLYOVER INCLUDING THE APPROACHES ON MUZAFFARNAGAR-HARIDWAR SECTION FROM KM. 206.220 TO KM. 208.870 OF NH-58 IN THE STATE OF UTTARAKHAND ON EPC MODE. | SEC BUILTECH PRIVATE LIMITED |
31. | GEOTECHNICAL INVESTIGATION FOR DESIGN & ENGINEERING CONSULTANCY SERVICES FOR IMPROVEMENT AND UPGRADATION OF EXISTING ROAD TO 2/4-LANE WITH PAVED SHOULDER FROM KM 40.00 TO 88.750, START OF KHUTAR BYPASS TO SHAHJAHANPUR BYPASS NH-731 ON EPC BASIS IN THE STATE OF UTTAR PRADESH | GODYAL INFRASTRUCURE PRIVATE LIMITED |
32. | GEOTECHNICAL INVESTIGATION FOR DESIGN, DRAWING, SUPPLY, ERECTION, TESTING AND COMMISSIONG OF 25KV, 50 HZ SINGLE PHASE OHE, SSP AND SCADA WORKS INCLUDING MODIFICATION OF OHE AT DANWAR RAILWAY STATION FOR THDC KHURJA STPP RAILWAY SIDING, DISTRICT- ULANDSHAHAR, NORTH CENTRAL RAILWAY, PRAYAGRAJ DIVISSION, IN THE STATE OF UTTAR PRADESH, INDIA” | KAILASH ELECTRICAS |
33. | GEOTECHNICAL INVESTIGATION FOR DESIGN PREPAIRATION OF DPR CONSTRUCTION AND O&M FOR 10 YEARS OF VARIUS RURAL SUPPLY PROJECTS COMPRISING OF TUBE WELLS, RISING/PRESSURE MAINS, CWRS, OVERHEAD TANKS, DISTRIBUTION PIPE NETWORKS, INDIVIDUAL HOUSE CONECTIONS, PUBLIC STAND POST ETC. LOCATED AT ETAWAH IN STATE OF UTTAR PRADESH. | ECOTONE SOLUTIONS |
34. | GEOTECHNICAL INVESTIGATION FOR WATER SUPPLY SCHEME OF DEVI-PATAN MANDAL GROUP OF VILLAGES IN DISTRICT BALRAMPUR IN THE STATE OF UTTAR PRADESH | DARA – ECO PROTECTION (JV), BALRAMPUR |
35. | PROPOSED CONSTRUCTION OF LUCKNWO PUBLIC WORLD SCHOOL AT EDUCATIONAL PLOT NO. 03, DLF GARDEN CITY AT MOHANLALGANJ IN LUCKNOW IN THE STATE OF UTTAR PRADESH | LUCKNOW PUBLIC CHARITABLE TRUST |
36. | GEOTECHNICAL INVESTIGATION FOR PROPOSED CONSTRUCTION OF (B+G+4) STOREY BUILDING AT PAPADI CHAURAHA, VRINDAVAN, UTTAR PRADESH | ANIRUDDHA JI MAHARAJ |
37. | GEOTECHNICAL INVESTIGATION FOR CONSTRUCTION OF SINGLE STOREY BUILDING AT UTSAV STHAL (I P EXTENSION PATPARGANJ) IN NEW DEHLI | Y K GOEL |
38. | GEOTECHNICAL INVESTIGATION FOR IMPLEMENTATION OF VARIOUS RURAL WATER SUPPLY PROJECTS COMPRISING OF TUBE WELLS, RISING/ PRESSURE MAINS, CWRS, OVERHEAD TANKS, DISTRIBUTION PIPE NETWORKS, INDIVIDUAL HOUSE CONNECTIONS, PUBLIC STAND POSTS ETC. LOCATED AT KANNAUJ IN THE STATE OF UTTAR PRADESH. | VSAIPPL-SMC JV |
39. | GEOTECHNICAL INVESTIGATION FOR IMPLEMENTATION OF VARIOUS RURAL WATER SUPPLY PROJECTS COMPRISING OF TUBE WELLS, RISING/ PRESSURE MAINS, CWRS, OVERHEAD TANKS, DISTRIBUTION PIPE NETWORKS, INDIVIDUAL HOUSE CONNECTIONS, PUBLIC STAND POSTS ETC. LOCATED AT KANPUR NAGAR IN THE STATE OF UTTAR PRADESH | LOGIX SOLUTIONS |
40. | GEOTECHNICAL INVESTIGATION FOR INSTALLATION OF STP/ETP AND EXTERNAL SEWAGE LINE WORK AT S N MEDICAL COLLEGE IN AGRA UTTAR PRADESH | M/s ENVIROTECH ENGINEERING SYSTEM |
41. | GEOTECHNICAL INVESTIGATION FOR PROPOSED CONSTRUCTION OF B+G+3 STOREY BUILDING AT GAURI GOPAL ASHRAM IN VRINDAVAN, UTTAR PRADESH | ANIRUDDHA JI MAHARAJ |
42. | GEOTECHNICAL INVESTIGATION FOR PROPOSED CONSTRUCTION OF B+G+2 BUILDING IN FRONT OF AROGYA MANDIR BASARATPUR GORAKHPUR, UTTAR PRADESH | Dr. Pratibha Singh |
43. | GEOTECHNICAL INVESTIGATION FOR DEVELOPMENT OF 6 LANE AMRITSAR-BHATINDA GREENFIELD SECTION OF NH-754A FROM VILLAGE TIBA ON NE-5A TO JUNCTION WITH MOGA JALANDHAR ROAD (NH-703) NEAR DHARMKOT (FROM KM 0+000 TO 39+000) AS PART OF AMRITSAR-JAMNAGAR ECONOMIC CORRIDOR IN THE STATE OF PUNJAB ON HYBRID ANNUITY MODE UNDER BHARATMALA PARIYOJNA (PACKAGE-I) | G R INFRAPROJECTS |
44. | GEOTECHNICAL INVESTIGATION FOR PROPOSED CONSTRUCTION OF HOSPITAL BUILDIND (B+G+5) NEAR SSB HEART MULTISPECIALITY HOSPITAL PLOT No. 65 & 66 SECTOR 20 A, NEW INDUSTRIAL TOWNSHIP FARIDABAD IN THE STATE OF HARYANA | M/s SSB HEART & MULTISPECIALITY HOSPITAL |
45. | Geotechnical Investigation at Imlai Plant, District-Damoh in the state of Madhya Pradesh | M/s Heidelberg Cement India Limited |
46. | Geotechnical Investigation for Construction of Mariahu Bypass with four lane paved shoulder configuration (Km. 53.540 to Km.59.200) of NH-135A on EPC mode in the state of Uttar Pradesh | M/s SEC BUILDTECH PVT. LTD. |
47. | ONST. OF COMMERCIAL BULDING,FOR SUNIL Kr. ANIL Kr. PLOT-4B COM-06, VRINDAVAN YOJNA,LUCKNOW | M/s ARCHITECHT AVENUE |
48. | GEOTECHNICAL INVESTIGATION FOR PACKER BUILDING SECTION AND ELEVATION DETAILS AT ADMINISTRATIVE BUILDING, KANPUR ROAD, VILLAGE-MADORA, DISTRICT-JHANSI, IN THE STATE OF UTTAR PRADESH | M/s Heidelberg Cement India Limited |
49. | Geotechnical Investigation for “Improvement of Up-Gradation of existing Road to 2/4-Lane with Paved Shoulder from km. 40.000 to 88+750, start Khutar bypass Road to start of Shahjahanpur bypass of NH 731 (PKG-I) in the state of Uttar Pradesh on EPC Mode”. | M/s S R CONSTRUCTION |
50. | SUB-SOIL INVESTIGATION FOR PROPOSED CONSTRUCTION OF BASUKINATH TO DEOGHAR SECTION OF NH 114A FROM DESIGN KM 85.081 TO DESIGN KM 130.240 IN THE STATE OF JHARKHAND ON HYBRID ANNUITY MODE | M/s TECKKONECT |
51. | GEOTECHNICAL INVESTIGATION FOR PROPOSED CONSTRUCTION TOWER AT PLOT NO. A-10,SECTOR 136, NOIDA, UTTAR PRADESH | M/s KEASIS INC |
52. | Geotechnical Investigation for Construction of 400/220KV (2x315 MVA) GIS Substation, Landhora, Haridwar, Construction of LILO of 400 kV Kashipur-Puhana Line at 400 kV Sub-Station Landhora and Construction of LILO of 220 KV Manglaur - Nara line at proposed 400/220/132 kV Substation Landhora, District Haridwar in the state of Uttarakhand" | M/s G. R. Infraprojects Limited |
53. | GEOTECHNICAL INVESTIGATION FOR CONSTRUCTION OF MAJOR BRIDGE AT CH=2+908 INI STATE OF ARUNACHAL PRADESH | M/s VKS INFRA PROJECTS PVT. LTD. |
54. | GEOTECHNICAL GEOTECH INVESTIGATION REPORT FOR PROPOSED CONSTRUCTION OF GROUP HOOSING (2B+G+26) NEAR CANCER HOSPITAL CG CITY LUCKNOW IN THE STATE OF UTTAR PRADESH | M/s D.P.S CANTRACTARS PVT. LTD |
55. | GEOTECHNICAL INVESTIGATION FOR PROPOSED CONSTRUCTION OF RESIDENTIAL BUILDING AT NIRMALA VIHAR, LUCKNOW, IN THE STATE OF UTTAR PRADESH | M/s NIRMALA INFRADEVELOPERS LIMITED |
56. | GEOTECHNICAL INVESTIGATION FOR PROPOSED CONSTRUCTION OF COMMERCIAL COMPLEX (B+G+2) STOREY BUILDING AT GARH MUKTESHWAR (TOLL PLAZA) DISTRICT- HAPUD IN THE STATE OF UTTAR PRADESH | M/s MAKKAR GREENWOODS |
57. | GEOTECHNICAL INVESTIGATION FORCONSTRUCTION OF WAREHOUSE AT PLOT No. 83 BOCK B-2 IN MOHAN CO-OPERATIVE INDUSTRIAL ESTATE, NEW DELHI | M/s ESPIRE CONGLOMERATE PVT. LTD |
58. | CONSTRUCTION OF 02 LANE RAIL OVER BRIDGE AT LEVEL X-ING NO 81 B ON BHAGWA CHUNGI CHAURAHA TO BHAGWA VILLAGE & ADDITIONAL LEAF OF 02 LANE BRIDGE ON RAILWAY COLONY SAHODARPUR MARG IN DISTT PRATAPGARH IN THE STATE OF UTTAR PRADESH | JASORIA BUILDERS |
59. | GEOTECHNICAL INVESTIGATION OF PROPOSED CONSTRUCTION OF REDEVELOPMENT OF GARBAGGE HOUSE (3 BIN FCTS) AT DAYAL CHAURAHA, LUCKNOW, IN THE STATE OF UTTAR PRADESH | M/s S.S. INFRATECH |
60. | GEOTECH INVESTIGATION FOR PROPOSED CONSTRUCTION OF FOOT OVER BRIDGE AT AMROHA RAILWAY STATION, IN THE STATE OF UTTAR PRADESH | M/s ARCHITECTS & INTERIOR DESIGNERS |
61. | Geotechnical Investigation for Improvement/ Widening to 2- Lane with paved shoulder/4-lanning of NH-40 between Shillong to Dawki up to Bangladesh Border including Dawki Bridge from (Design km 10+670 to km 37+550) design length of 26.550 km in the State of Meghalaya for execution of EPC mode under JICA funding-(Package-II) Balance Work) | YFC PROJECTS PVT. LTD. -JV- M/s ACE CONSTRUCTION |
62. | GEOTECHNICAL INVESTIGATION FOR AUGMENTATION WORK OF SICK LINE SHED WITH THE EXISTING SICK LINE SHED AT ICD DADRI | M/s KONKAN RAILWAY CORPORATION LIMITED |
63. | Geotechnical Investigation for Improvements and Widening of Carriageway SH-193 to Yavaluj Donavade to SH 117 to Balinge Mahepati Bid Arale Road MDR 29 km 8/000 to 60/000, Tal karveer Dist-Kolhapur in the state of Maharastra | M/s Accrete Consulting Engineers Pvt. Ltd. |
64. | GEOTECHNICAL INVESTIGATION FOR -IMPROVEMENT & UP-GRADATION OF NH-74 (NEW-30) STRECH PILIBHIT TO SITARGANJ FROM KM. 32+500 TO 64+800 & CH. 0.00 TO 6.00 (SITARGANJ BYPASS ) HAM BASIS IN THE STATE OF UTTAR PRADESH AND UTTARAKHAND (PACKAGE-II BAREILLY-SITARGANJ) | M/s TECKKONNECT |